Página 58 - elastimold

Versión de HTML Básico

CABLE ACCESSORIES
Separable Connectors
200A Loadbreak
200 Amp loadbreak connectors
and accessories provide a con-
venient method to connect/dis-
connect cable and equipment
on power distribution systems.
Loadbreak elbows include pro-
visions for energized operation
using standard hotstick tools,
allowing loadmake/break oper-
ation and a visible disconnect.
Components can be isolated
with insulated caps, plugs and
parking bushings.
Optional accessories allow sys-
tem grounding, testing, bypass,
lightning surge protection
and current limiting fusing.
Additional connecting points
and taps can be provided by
use of junctions or feed-thrus.
AT GS VE V EW
See page 2 for complete information
including switching and fault close
ratings.
CU E T AT GS
200A Continuous
10kA sym. 10 Cycles
V LTAGE AT GS
5kV Class
8.3kV Phase-to-Ground
14.4kV Phase-to-Phase
95kV BIL
34kV AC Withstand
53kV DC Withstand
11kV Corona Extinction
25kV Class
15.2kV Phase-to-Ground
26.3kV Phase-to-Phase
125kV BIL
40kV AC Withstand
78kV DC Withstand
19kV Corona Extinction
35kV Class
21.1kV Phase-to-Ground
36.6kV Phase-to-Phase
150kV BIL
50kV AC Withstand
103kV DC Withstand
26kV Corona Extinction
BUSHING WELL
PLUG
FUSED ELBOW
LOADBREAK
FEED-THRU INSERT
FEED THRU
CABLE TO EQUIPMENT
CONNECTIONS
PARKING
STAND
SEE CABLE NOTES
INSULATED CAP
WITH GROUND
ELBOW
GROUNDING
OPERATING ACCESSORIES
REPLACEMENT
ELBOW
INSULATED PARKING
BUSHING
LOADBREAK ELBOW CONNECTOR
WITH OR WITHOUT TEST POINT
BUSHING
WELL
ASSEMBLY TOOL
SEE CABLE NOTES
INSULATED CAP
SEE PRODUCT
GUIDE PG-PC-H
BOLTED
ELBOW
W/TAP
GROUNDING
PLUG
REPAIR
ELBOW
SEE CABLE NOTES
LOADBREAK
BUSHING INSERT
TEST ROD
EXTENDED
BUSHING INSERT
SEE PRODUCT GUIDE
PG-PC-E FOR
SURGE ARRESTER
APPLICATIONS
200 A P L ADB EAK SEPA ABLE C ECT C P E TS
200 Amp Loadbreak